Mosel Surveyors were site surveyors for the $45m redevelopment of the Bridgeport Hotel, for the entirety of the construction phase.    
An outer boundary survey was undertaken as one of the first phases of the project, prior to commencing any set out on site.  Given the tight tolerances of the project and structures built to boundary this was critical in ensuring no encroachments were created.
The project involved the demolition of the existing structure, and construction of a new state of the art, 7 storey building including basement.  Our team of experienced surveyors were responsible for setting out piles and footings for the basement structure, set out for insitu concrete, block and precast walls, setout of all vertical and horizontal in slab columns all the way through to the final steel structures on the rooftop.    
Mosel Surveyors are proud to have been involved in the construction of such an iconic building for Murray Bridge & the Murray River landscape.   

Bridgeport Hotel
 

Our Locations

Kadina

6 Graves St, Kadina 5554

08 8821 3544

Murray Bridge

9 Verdun Road, Murray Bridge 5253

08 8532 5555

Clare

Consulting Mon & Tues

20 Union St, Clare 5453

08 8842 1228

Adelaide

Consultation by appointment

1300 853 203

Follow us

  • Facebook
  • Instagram
  • LinkedIn

     © 2025 Mosel Surveyors  

bottom of page